2014 Cedar River Watershed LiDAR Project
|
|
Description This project covers the first and second delivery of the Cedar River Watershed Project. The first delivery covers a portion of the SCL/Tolt Reservoir--an area north of the City of Duvall to Marysville. The second delivery covers the remainder of the SCL/Tolt Reservoir, Lake Young Reservoir, and the Cedar River Watershed and Floodplain area of interest. The data was acquired between October 2013 and July 2014. See the project reports below for more information. Projection: Washington State Plane North (FIPS 4601) Vertical Datum: NAVD88 Geoid03 Horizontal Datum: NAD83 (HARN) Units: US Survey Feet Reference Information Quarter Quad Index (Shapefile) LAS Tile Index (Shapefile) Trajectory Files (Shapefile) Frequently Asked Questions Delivery 1 Project report Bare Earth raster metadata Top surface raster metadata Delivery 2 Project report Bare Earth raster metadata Top Surface raster metadata |